It's been a month since i've last posted here. Had about 3 consultations since Interim1C Contact 14. So i had Interim 1 D, E, and Mid-Critic Session. And that happened for the past one month before New Year, while the Mid-Crit Session just happened today. I'm not really sure if i should be saying if it had gotten good or bad.
Good in ways that i was able to complete more than the number of scenes that i should be completing in a week, however i'm still very much behind schedule by half. Compared to last time, i was like 2/10. Now im 7/14. But it's still slow. I need to really go all nighter and quit cyber surfing for a moment. I'll be honest, the net distracts me alot. So i'll be plucking out the net server so that i wont be able to use the wireless anymore, only before bedtime where i get to check my emails and updates.
(I'll post up some images or videos later.. For now it be just text. Later *wave* )
So here are some info updates:
Mid-Critic Session:
Showed the updated animatic
Showed the finished/updated scenes:
(Complete: 01, 11, 19, 21, 30, 32), (Bg + Keyframe: 18, 20)
Behind schedule: (02, 03, 04, 05, 07, 18, 20, 21B)
Lecturer comments:
- Scene11 is jerky.
- Scene21B change the composition of the frame (360 degree rule); the position of the frame on the table to be on the right part of the frame instead of the left, while the guy's position change to the left part of the frame.
- Some of the scenes could add a little of animations.
- Productivity rate is slow, find a way to work faster.
You're Listening to a shuffled video playlist...
Tuesday, January 5, 2010
Subscribe to:
Comments (Atom)



