It's been a month since i've last posted here. Had about 3 consultations since Interim1C Contact 14. So i had Interim 1 D, E, and Mid-Critic Session. And that happened for the past one month before New Year, while the Mid-Crit Session just happened today. I'm not really sure if i should be saying if it had gotten good or bad.
Good in ways that i was able to complete more than the number of scenes that i should be completing in a week, however i'm still very much behind schedule by half. Compared to last time, i was like 2/10. Now im 7/14. But it's still slow. I need to really go all nighter and quit cyber surfing for a moment. I'll be honest, the net distracts me alot. So i'll be plucking out the net server so that i wont be able to use the wireless anymore, only before bedtime where i get to check my emails and updates.
(I'll post up some images or videos later.. For now it be just text. Later *wave* )
So here are some info updates:
Mid-Critic Session:
Showed the updated animatic
Showed the finished/updated scenes:
(Complete: 01, 11, 19, 21, 30, 32), (Bg + Keyframe: 18, 20)
Behind schedule: (02, 03, 04, 05, 07, 18, 20, 21B)
Lecturer comments:
- Scene11 is jerky.
- Scene21B change the composition of the frame (360 degree rule); the position of the frame on the table to be on the right part of the frame instead of the left, while the guy's position change to the left part of the frame.
- Some of the scenes could add a little of animations.
- Productivity rate is slow, find a way to work faster.
You're Listening to a shuffled video playlist...
Tuesday, January 5, 2010
Friday, December 18, 2009
Interim1C Contact14 - Behind Schedule
It's the interim1-C and once again, we showed what we have been doing for the past one week. I uploaded my updated animatic for "show and tell". And from the looks of it, I'm way behind schedule. I only manage to finish 2 scenes out of the 7 scenes which had to be done by the end of this week. The rest of the unfinished scenes are either untouched or half-done. That includes scene1 and 2 which I was struggling with.
The feedback and notes that i got was that by Week 11, we had to finish all the scenes that we wrote on our schedule til that week. And i'm lagging by 8scenes. Hmm... And by this time, there should be no more changes to be done for the story-plot or scenes, and we all had to take notes/pay attention to our scenes which requires to "zoom in/out" (timing, proportion, perspective, etc.) Well, that's all for now.
Hello weekends! =)
ANd am back to work x,...,X
The feedback and notes that i got was that by Week 11, we had to finish all the scenes that we wrote on our schedule til that week. And i'm lagging by 8scenes. Hmm... And by this time, there should be no more changes to be done for the story-plot or scenes, and we all had to take notes/pay attention to our scenes which requires to "zoom in/out" (timing, proportion, perspective, etc.) Well, that's all for now.